NSC布局和园艺
- MerthyrTydfil
- 自2018年10月起成员
- 8评审·88%正数评分
启动您的项目
受邀者NSC布局和园艺向您提供引文 并享受所有利益 发布工作 MyBuilder
-
更新平台园林美化
内森为我们做得很好他看工作2次 因为我们改变了我们想做的事他很有帮助 没有什么太麻烦
人造草和Aco排水管安装
内森斯工作高标准 结业工作看起来棒极了
高推荐并再次使用内森康涅34116-19线程2021年4月正面审查
-
小广场铺设园林美化
drg_2915线程2021年3月等待审查
-
四米四米花园园林美化
kelly72864_22- 10线程2021年3月等待审查
-
新建Patio园林美化
Nice feller BUT, Dissapointed with the work, He had to lift and relay 25 odd Paving due to not being laid level, causing a deep 2"-3" pool of Water holding in front of the Conservatory Also Drainage channels laid in front of Conservatory was badly sloping, Hole was dug aprox 6-8" deep on the one end and filled with Pebbles, because he said the Concrete would be too hard to cut to drop the Channels in for the water to run along and away and was told its ok the water will seep into the ground, I called him in the evening to say that the channel was full of rain water, he said no the water was cleared when I did it, He came up and I showed him that it was holding FULL of Water In the end I told him that I will finish the job my self, Which I did, Got the Drainage channels level and draining good
无67925号线程杨2021负审查
NSCBrickwork园艺回复:
Thankyou for you're response Hayden sorry you feel this way but 1st of all I talked to you about the drainage before we started as I've stated many times as we've spoken you were insisting on me laying the patio all the way to the extension which I did as you requested you then requested I take the paving up and lay an aco channel to take the water away which I did but ran it the opposite way to the paving because that is the only way it could be done because you had concrete under the new paving which you were insistent on me laying on top of I laid the aco drain into a soak away which was working when I checked you then Doug out what I had done and you could see you're self that the bottom of the earth had become coated with about 5 mm of cement due to it raining during the night after I'd laid the paving again therefore the water couldn't soak trough cement I then came back again and told you the way to resolve it which I was planning to do in the begging that's why I said about drainage before we started but I came back again and was happy to do it at an extra charge which I thought was more than fair because I had already put the drainage and relayed the slabs for nothing extra and then a day before I was due to come you phoned me saying you didn't want me to come I accept that that's fine I've said my view and won't reply again Thankyou for you're feedback.
-
建小保留墙布瑞克林
i2078826号线程2020年5月等待审查
-
清除墙并修复地面布瑞克林
shirley37036级线程2020年5月等待审查