-
地毯适配大厅加起居室地毯Lino
ABBE8735421号st2021年12月等待反馈
-
工程木板搭建硬楼层
向里德纳先生表示诚挚的感谢服务从始至终都是无可挑剔的Dean在所有方面都极有才华 工程木搭建KahrsOakPro白楼搭建到入口/休息室和登陆这是一项技术挑战性项目,完成水平正是我所期望和期望的我毫不犹豫地表扬这位精通礼貌并乐于在家工作的优秀专业人员。放心使用Dean安装的橡树工程木板
rishi_sood8级线程2021年8月正面反馈
-
各种作业悬浮镜杂工
几个月前我整理平底板 每天我看着差工令我失望的是结果, 如果我有工具,我就会做得更好外公从我这里取下它 因你失望他开始开工 并割短板 所以当他把条状连接地毯人该与我搭建者脱机了 他很失望 你怎能忘记胶合我拍错工作技巧SOSAD
June54486-19线程2021年7月负反馈
双层回复 :
First off it was 4 upstairs rooms, all full of furniture and stuff, I didn't stick one wall with beading (not skirting) because I had ran out of glue, as I was coming back the next day, it wouldn't be a problem, when I returned the room, (a small bedroom was completely full of boxes and a bed) I couldn't see the wall let alone get at it, as for the gap, it was fitted good, when I returned to fit the skirting, there was a gap, caused by the massive heavy double wardrobe, that was in the room being push and dragged away from the door, not by me, because its a floating floor, it moved away from the door, as the skirting was allready, fixed on the back wall, she said just leave it, I offered to lift the door bar and fit another small pice into it, as there was a groove there, but she said it dosnt matter, she also never paid me for the 4 doors I cut or the extra materials I bought, I did this job at the beginning of June and now a complaint,
-
定时插件硬楼层
Dean表示友好并稳稳工作并总体取得良好结果时抵达从头起提供合理引文 很明显他有铺层经验未来用工作表保护层裁剪时, 我唯一能提供建设性反馈, 因为房里有很多锯尘和污迹本可以避免(尽管没有什么小块油脂无法消除 ) 。这并不是说 他走时没有打扫 只是需要留意谢谢
Pal8916线程2021年5月正面反馈
-
定时楼层拟合硬楼层
Lindsey5902329级线程2018年11月等待反馈
-
改换卧室地毯地毯Lino
maria1072923号华府2018年8月等待反馈
-
拆换现有卧室地毯地毯Lino
goral118号线程2017年3月等待反馈
-
西沙地毯需要搭建楼梯、登陆和床地毯Lino
nrobts0511-2后端2017年1月等待反馈